Facilities Management Online - UK Product & Service Supplier Locator - Swifter Sourcing - Speedier Selling
The UK Business Advertiser - Targeted Business Buyers Guide
Home News Products Diary About Us Advertise Subscribe Search
 

Access Control
Access Equipment
Advertising Services
Asset Tracking
Audio Visual Solutions
Automation and Drives
Badges
Battery Maintenance
Blinds
Boiler Rental
Bollards and Barriers
Building Inspection
Building Maintenance
Business And Management Consultants
Business Continuity
CAFM
Cashless Payment
Catering and Vending
Catering Equipment
Ceilings
Chiller Rental
Cleaning
Closed Circuit TV
Coffee Machines
Commercial Vehicle Leasing
Communications
Construction & Property
Consultancy & Business Management
Corporate Accommodation
Corporate Data Suppliers
Corporate Entertainment
Corporate Finance
Crate Hire
Data Cabling
Data Centres
Daylight Systems
Disability Access Consultancies
Dishwashing
Document Management
Drains
e-Learning
e-Marketing
e-Tendering
Electrical Solutions
Energy Mng Utility Metering
Energy Rating Software
Equipment Workplace
Extranet/Intranet Web Development
Filing Systems
Fire
Fleet Cars
Flooring
Furniture
Gate Automation
Guard Patrol Systems
Gutter Cleaning & Lining
Health and Safety
Heating Ventilation
HVAC
Industrial Doors
Information Technology
Internet and Network Services
Laundry Equipment
Laundry Services
Lifts
Lighting
Loading Bay Specialists
Locks and Keys
Mailroom Management
Management Training & Development
Movers Intelligence
Office Art - Canvases
Office Design & Fitting Out
Office Partitioning
Office Space
Payroll Funding
Portable Building Solutions
Power Management
Power UPS
Printers Scanners Faxes
Recruitment
Recycling
Refreshment Machines
Relocation
Removals
Risk Assessment
Roofing
Scaffolding Services
Security
Server Rooms
Shelving
Shredding Services
Signage
Stationery
Storage
Thermal Imaging
Total FM
Training Programs
Underfloor Heating
Utility Vehicles
Vending Solutions
Visitor Management
Wash Room
Waste Management
Water Machines
Water Treatment
Wholesale Tea And Coffee
Workplace Services


Fulton Experience Secures Plant Room Order At Hmyoi Wetherby

29-05-2006

Email this page to a colleague

Fulton Boiler Works has supplied four prefabricated heating and hot water plant rooms to Her Majesty's Young Offenders Institution (HMYOI) at Wetherby, to initially provide cover for the early stages of a central boiler plant decommissioning and decentralisation programme.

HMYOI Wetherby offers training to 15 to 17 year olds committed by the courts to provide constructive regimes that address offending behaviour, improve educational and work skills and promote law abiding behaviour in custody and after release. As the site is a secure establishment, it was decided to prefabricate the plant rooms at Fulton’s factory in Bristol to minimise on-site work and disruption during commissioning.

Working closely with Wetherby’s site manager, Fulton’s design team developed an engineering specification in just one week that met the requirements of the institution. “Plant rooms were required at four different locations, each for a different application.” explains Fulton’s Gordon Bareham. “The different applications meant that each plant room required two boilers, each meeting a minimum of 60% full load.”

Each plant room also housed plate heat exchangers for the hot water system load, pressurisation sets and all associated control and safety equipment. Three of the plant rooms also included integral oil storage tanks.

As space was restricted, the physical size of the plant rooms had to be kept to a minimum. The use of Fulton’s latest CAD system helped to locate the integrated components in the best possible positions for the small footprint and for interconnecting M&E services.

Gordon Bareham explains that this type of bespoke, turnkey project has become a major part of the Fulton business over the past few years and the many advantages of off-site fabrication were clearly demonstrated during this project. He adds that the use of high quality equipment that is factory-built with a minimum of site work was particularly important for a project such as HMYOI Wetherby.

Having completed the design process by the end of November 2005, the next time-critical task for Fulton was to deliver two completed plant rooms by the end of January and two by mid-February. A build programme was put in place over the Christmas and New Year periods to achieve the schedule, with the plant rooms being commissioned and operational in-time.

Commenting for HMYOI Wetherby, the site manager says: “We are delighted with the efforts of the Fulton team and the plant rooms they have developed and commissioned for us. The quality of Fulton's products and service has been the lynchpin in achieving this project's goals and their experience and skills in boiler design and off-site fabrication ensured that we had the project completed in time.”

He adds that the four plant rooms were initially supplied as a temporary measure, but proved so reliable and efficient that they have now been adopted as permanent fixtures.

For further information, please contact:

< Back To News Menu





 

 

Published by Facilities Management Online Ltd and distributed at the discretion of the publishers. The information contained within www.fmonline.co.uk has been obtained from sources which the proprietors believe to have been correctly reproduced but they cannot legal liability for any error in it howsoever caused. The views expressed are not necessarily those of the publisher. No part of this publication may be reproduced without the written consent of the publisher.


©1998 - 2007 Facilities Management Online Ltd ~ UK Product & Service Supplier Locator - Swifter Sourcing - Speedier Selling
Powered by the Absolutely Interactive Content Management System